
750 KLDBuilt and maintained by AGT
Sewage treatment
plants (STP)
for
buildings and industries
MBR and SBR plants from 5 to 750 KLD, for apartments, commercial buildings and industries. 78 sewage plants on record. AGT Infra, Bengaluru.
Get a sized quote
AGT calls you back to confirm the size.
What happens next
- 1Send your flats or KLD.
- 2AGT confirms the size from your drawings or a site study.
- 3You get a sized quote.
What size do you need?
KLD is kilolitres a day. One KLD is 1,000 litres.
| Size | Sewage a day | Serves about |
|---|---|---|
| 5 KLD | 5,000 litres | 11 flats |
| 10 KLD | 10,000 litres | 23 flats |
| 25 KLD | 25,000 litres | 57 flats |
| 50 KLD | 50,000 litres | 115 flats |
| 100 KLD | 1,00,000 litres | 231 flats |
| 200 KLD | 2,00,000 litres | 462 flats |
| 300 KLD | 3,00,000 litres | 694 flats |
| 500 KLD | 5,00,000 litres | 1,157 flats |
| 750 KLD | 7,50,000 litres | 1,736 flats |
Up to 500 KLD: standard MBR sizes. 750 KLD: an SBR plant built to the site. Flats assume 4 people a flat, 135 litres a person a day and 80% leaving as sewage.
Planning estimate
About 52 KLD of sewage a day
120 flats × 4 people × 135 litres × 80% = 51,840 litres a day
Standard sizes either side: 50 KLD and 100 KLD. We also customise sizes to the site.
AGT builds MBR plants in standard sizes from 5 to 500 KLD, and SBR plants such as the 550 to 750 KLD plants on this page. We recommend the process for your site after a site study.
Inside a 750 KLD SBR plant AGT built and maintains
One plant, five photographs. The plant hall at the top of this page is the same plant.



03750 KLDSBR sewage plant






04750 KLDSBR sewage plant

Raw water in, treated water out
Samples from an AGT sewage plant, before and after treatment.


STP technologies and their benefits
AGT builds MBR and SBR sewage plants, and recommends one for your site after a site study.
MBR: membrane bioreactor
Hollow-fibre membranes, with pores of 0.04 to 0.2 micron, sit in the bioreactor and hold back solids and bacteria. AGT makes its own membranes.
- Clearer treated water, ready for reuse
- Less sludge to remove
- A compact plant that fits a small plant room
- Less chemical use
- Grows with the building: add membrane modules
SBR: sequencing batch reactor
One tank fills, is aerated, settles, and the clear water is drawn off, in timed cycles. AGT builds SBR plants for larger flows, such as the 550 to 750 KLD plants on this page.
- Aeration and settling in one tank, with no separate clarifier
- Cycles run automatically through the day
- Suited to large buildings and campuses
Configurations
Packaged
A compact plant that arrives complete with its pumps, blower and controls.
Mobile
A compact plant that can be moved from one site to another, for 5,000 to 20,000 litres a day.
Automatic
Filling, filtration and backwashing run on a PLC, with remote monitoring over a mobile network.
Commercial
A submerged membrane bioreactor for offices, hotels and commercial buildings.
Two more plants AGT built and maintains
SBR sewage plants of 550 and 600 KLD.



Our STP projects in Karnataka
78 of our 97 named projects are sewage plants. These are the ones in Karnataka.
Apartments and builders8Hombale Constructions (BDA) and 7 more
- Hombale Constructions (BDA)Bengaluru
- Abihram Infrastructure (BDA)
- Asset BuildersBengaluru
- Soul Space ArenaBengaluru
- Gouthami ComfortsBengaluru
- Griha BuildersBengaluru
- Keshava ConstructionsKarwar
- VBHC
Hotels and resorts5Five-star resort project and 4 more
- Five-star resort projectShivamogga · 70 KLD · in progress
- Bengaluru Marriott Hotel WhitefieldWhitefield, Bengaluru
- Park Plaza HotelBengaluru
- Krishna InnShivamogga
- Krishna InnBengaluru
Hospitals, schools and colleges6AIMS University and 5 more
- AIMS University40 KLD · in progress
- Suyog HospitalMysuru
- Sai HospitalRanebennur
- Central SchoolTumakuru
- NPSChannapatna
- Sudarshan Institution
Public bodies5Karnataka Housing Board and 4 more
- Karnataka Housing Board
- Public Works Department
- Bangalore Development Authority
- Bangalore Development Authority, Gunjur
- Bangalore Development Authority, KothanurBengaluru
Industry and others7Genmax Technologies and 6 more
- Genmax TechnologiesBengaluru · 10 KLD · in progress
- Hindustan Aeronautics Limited (HAL)
- Exide Industries LimitedBengaluru
- Resil Chemicals Private LimitedBengaluru
- Mahajan AssociatesHosapete
- Bisneer Sales and ServiceBengaluru
- Innser SpaceBengaluru
Two more plants AGT built and maintains
SBR sewage plants of 550 and 600 KLD.



Questions about sewage plants
What does KLD mean?
KLD is kilolitres a day. One KLD is 1,000 litres. A 50 KLD plant treats up to 50,000 litres of sewage a day.
How do I know what size of plant we need?
Start with the size guide. Flats, people per flat and litres per person give the daily sewage. The final size follows a site study and your real water use. Send us your flat count or your drawings and we will come back with a sized quote.
What does a sewage plant cost?
It depends on the size in KLD, whether the plant is packaged or built to your site, and how much of it runs automatically. Send us your flats or KLD, or your drawings, and we will come back with a sized quote.
What is an SBR sewage plant?
SBR stands for sequencing batch reactor. The plant treats sewage in batches in the same tank: it fills, is aerated, settles, and the clear water on top is drawn off. That last step is called decanting.
What is an MBR sewage plant?
MBR stands for membrane bioreactor. It combines biological treatment with membrane filtration: hollow-fibre membranes sit inside the reactor and hold back solids and bacteria, so the plant is compact and the treated water comes out clear.
MBR or SBR: which do we need?
It depends on the flow, the space you have and how the treated water will be reused. AGT recommends one after a site study, and builds both.
Can the treated water be reused?
Yes. Treated water can be reused for irrigation and industrial processes. What suits your site depends on the use, and we confirm it at design.

600 KLDSBR sewage plant
Get a sized quote for your sewage plant.
Tell us your flats or KLD, the city, and whether the plant is new or existing.
Or email info@agtinfra.in


